All categories
-
PART I INTRODUCTION
-
PART II INSTITUTIONAL AND REGULATORY FRAMEWORK
-
PART III TECHNICAL BASIS
-
3 Overview of Rural Sanitation and Wastewater Management
-
4 Rural Wastewater Treatment Technology
-
5 Wastewater Treatment Process Design
-
-
PART IV PROJECT PLANNING AND DESIGN
-
6 Project Planning and Design
-
6.1 Diagnosis for Project Villages – Initial Community Assessment
-
6.2 Establishment of Stakeholder Group
-
6.3 Assessment on Existing Conditions and Community’s Capacity
-
6.4 Baseline Engineering Survey and Assessment
-
6.5 Project Feasibility Study and Environmental Impact Assessment
-
6.6 Selection of Operation Model
-
6.7 Project Cost Estimate
-
-
7 Community Participation
-
-
PART V PROJECT FINANCING
-
PART VI PROJECT IMPLEMENTATION AND MANAGEMENT
-
9 Procurement and Implementation
-
10 System Adminstration, Operation, Maintenance and Monitoring
-
-
Appendix: Case Studies – Rural Wastewater Management in Zhejiang, Shanxi, and Jiangsu Province
-
REFERENCES
5.2.4.Indicative Costs of Sewer System
- Categories: 5.2 Sewage Collection Alternatives
- Time of issue: 2022-05-16 15:13:14
- Views: 0
Description:
Information
The indicative costs for sewer pipes are listed in Table 5.2.
Table 5.2 Indicative costs for sewer pipes
Item |
Pipe size (mm) |
Cost (CNY/m) |
Investment percentage (%) |
|
Material |
Labor |
|||
Household connection pipe |
75 |
20-35 |
60 |
40 |
100 |
30-45 |
65 |
35 |
|
Branch sewer |
200 |
50-130 |
80 |
20 |
300 |
150-250 |
85 |
15 |
|
400 |
200-350 |
90 |
10 |
|
Sewer main |
600 |
600-850 |
90 |
10 |
800 |
950-1250 |
90 |
10 |
|
1000 |
1100-1550 |
90 |
10 |
Note: The indicative costs include inspection wells and are based on the market price in year 2010. The costs shall be adjusted according to local economic conditions. The labor costs in developed area in east region can be increased by 10%-30%, and in underdeveloped area it can be decreased by 10%-30%.
Source: Guideline for Construction and Investment of Rural Domestic Wastewater Treatment Project (2013)