All categories
-
PART I INTRODUCTION
-
PART II INSTITUTIONAL AND REGULATORY FRAMEWORK
-
2.INSTITUTIONAL, POLICY, REGULATORY FRAMEWORK FOR RURAL SANITATION AND WASTEWATER MANAGEMENT
-
2.1 Overview
-
2.2.Institutional Arrangement
-
2.3.Policies and Regulations
-
2.4 Discharge Standards
-
2.5.Sources of funds
-
2.6.Typical provincial cases
-
2.7.Conclusions and recommendations
-
-
-
PART III TECHNICAL BASIS
-
3 Overview of Rural Sanitation and Wastewater Management
-
3.1 Domestic Wastewater
-
3.2 Rural Toilets in China – Source of Black Water
-
3.3 Decentralized vs. Centralized Rural Wastewater Management
-
-
4 Rural Wastewater Treatment Technology
-
4.1 Preliminary Treatment
-
4.2. Primary Treatment
-
4.3 Secondary Treatment
-
4.3.1 Attached Growth Process
-
4.3.2 Suspended growth Process
-
4.3.3 Waste Stabilization Pond
-
4.3.4 Constructed Wetlands
-
4.3.5 Subsurface Wastewater Infiltration Systems
-
-
-
5 Wastewater Treatment Process Design
-
5.1 General Design Consideration
-
5.2 Sewage Collection Alternatives
-
5.3 Wastewater Treatment Process Design
-
5.4 Water Reuse
-
5.5 Sludge Management
-
-
-
PART IV PROJECT PLANNING AND DESIGN
-
6 Project Planning and Design
-
6.1 Diagnosis for Project Villages – Initial Community Assessment
-
6.2 Establishment of Stakeholder Group
-
6.3 Assessment on Existing Conditions and Community’s Capacity
-
6.3.1 Physical Conditions Assessment
-
6.3.2 Community’s Capacity Assessment
-
-
6.4 Baseline Engineering Survey and Assessment
-
6.5 Project Feasibility Study and Environmental Impact Assessment
-
6.6 Selection of Operation Model
-
6.7 Project Cost Estimate
-
-
7 Community Participation
-
7.1 Why Need Community Participation?
-
7.2 Principles of Community Participation
-
7.3 Community Participation Activities
-
-
-
PART V PROJECT FINANCING
-
8 Financing, Subsidies, and Cost Recovery
-
8.1 Programmatic Costs
-
8.2 Project Implementation Costs
-
8.3 Project Financing
-
8.4 Subsidies
-
8.5 Cost Recovery
-
-
-
PART VI PROJECT IMPLEMENTATION AND MANAGEMENT
-
9 Procurement and Implementation
-
9.1 Procurement Principles
-
9.2 Procurement Alternatives
-
9.3 Procurement Planning
-
-
10 System Adminstration, Operation, Maintenance and Monitoring
-
10.1 Introduction
-
10.2 Management and Administration Arrangement
-
10.3 Operation and Maintenance
-
10.4 Reporting and Monitoring
-
10.5 Operator Training and Support
-
-
-
Appendix: Case Studies – Rural Wastewater Management in Zhejiang, Shanxi, and Jiangsu Province
-
1.Zhejiang Province
-
2.Shanxi Province
-
3.Jiangsu Province
-
4.Summary
-
-
REFERENCES
5.2.4.Indicative Costs of Sewer System
- Categories: 5.2 Sewage Collection Alternatives
- Time of issue: 2022-05-16 15:13:14
- Views: 0
Description:
Information
The indicative costs for sewer pipes are listed in Table 5.2.
Table 5.2 Indicative costs for sewer pipes
Item |
Pipe size (mm) |
Cost (CNY/m) |
Investment percentage (%) |
|
Material |
Labor |
|||
Household connection pipe |
75 |
20-35 |
60 |
40 |
100 |
30-45 |
65 |
35 |
|
Branch sewer |
200 |
50-130 |
80 |
20 |
300 |
150-250 |
85 |
15 |
|
400 |
200-350 |
90 |
10 |
|
Sewer main |
600 |
600-850 |
90 |
10 |
800 |
950-1250 |
90 |
10 |
|
1000 |
1100-1550 |
90 |
10 |
Note: The indicative costs include inspection wells and are based on the market price in year 2010. The costs shall be adjusted according to local economic conditions. The labor costs in developed area in east region can be increased by 10%-30%, and in underdeveloped area it can be decreased by 10%-30%.
Source: Guideline for Construction and Investment of Rural Domestic Wastewater Treatment Project (2013)