PART I INTRODUCTION
-
PART II INSTITUTIONAL AND REGULATORY FRAMEWORK
-
PART III TECHNICAL BASIS
-
3 Overview of Rural Sanitation and Wastewater Management
-
4 Rural Wastewater Treatment Technology
-
5 Wastewater Treatment Process Design
-
-
PART IV PROJECT PLANNING AND DESIGN
-
6 Project Planning and Design
-
6.1 Diagnosis for Project Villages – Initial Community Assessment
-
6.2 Establishment of Stakeholder Group
-
6.3 Assessment on Existing Conditions and Community’s Capacity
-
6.4 Baseline Engineering Survey and Assessment
-
6.5 Project Feasibility Study and Environmental Impact Assessment
-
6.6 Selection of Operation Model
-
6.7 Project Cost Estimate
-
-
7 Community Participation
-
-
PART V PROJECT FINANCING
-
PART VI PROJECT IMPLEMENTATION AND MANAGEMENT
-
9 Procurement and Implementation
-
10 System Adminstration, Operation, Maintenance and Monitoring
-
-
Appendix: Case Studies – Rural Wastewater Management in Zhejiang, Shanxi, and Jiangsu Province
-
REFERENCES
10.3.4 Sludge and Residual Management
- Categories: 10.3 Operation and Maintenance
- Time of issue: 2022-04-28 10:47:32
- Views: 0
All wastewater treatment systems generate residual solids that require either on-site treatment or removal to an off-site sludge treatment facility. The O&M plan should provide basic information pertaining to the management of sludge; however, the private operator may need to review and update these procedures once the plant is operating. For any process in the treatment system that either generates or stores sludge, an expected removal frequency and means of removal shall be provided. Sludge management approaches refer to Section 5.5 Sludge Management.
The system operator will need to measure the depth of solids accumulating in different unit processes regularly, so that the solids can be removed before the level of solids impacts the performance of the treatment unit.